Project:

King's Crescent, Hackney

Delivering award winning, high quality, multi-phased estate regeneration in Hackney

Tibbalds were appointed by London Borough of Hackney to work as part of a wider team on the regeneration of the Kings Crescent. The multi-phased project saw a hybrid application covering the whole estate submitted initially, with the first phases submitted in detail. More recently a new detailed application has been submitted for the final phases in order to revisit some of the masterplan principles.

Project Deliverables:
765 dwellings: 490 new homes, refurbishment of 275 existing
Client:
The London Borough of Hackney
Collaborators:
Karakusevic Carson Architects, Henley Hale Brown, MUF, WSP, XCO2, Waldrams
Location:
The London Borough of Hackney
Status:
First phases complete and occupied, phases three and four approved at Committee by LB Hackney in November 2019 and currently awaiting GLA sign-of

A number of previous attempts at regeneration of the Kings Crescent Estate had failed. As part of a new team Tibbalds secured planning consent for high quality regeneration of the estate with the first phases now delivered and in occupation.

The Kings Crescent had been subject to a number of unsuccessful attempts at regeneration over several years. Demolition of some blocks had already taken place and the community were frustrated with the ongoing delay to new homes being provided and much needed improvement works. Tibbalds were appointed as part of new design team to revisit previous attempts at regeneration and secure planning consent for the regeneration of the whole estate that was deliverable, innovative and of exceptional design quality.

A revised masterplan was developed and outline planning consent obtained for the regeneration of the whole estate, including significant improvement works to existing homes. The first phases were submitted in detail and are now built and occupied. Before commencing construction on the final phases the masterplan principles within the outline planning consent were revisited, to address consultation comments, resulting in a separate detailed planning application being submitted.

First phases complete and occupied, phases three and four approved at Committee by LB Hackney in November 2019 and currently awaiting GLA sign-of

Awards


  • Civic Trust Award 2019, Regional Finalist

  • RIBA National Award 2018, Winner

  • RIBA London Award 2018, Winner

  • New London Award Mayor's Prize 2018, Winner

  • Architect of the Year Award 2014, Winner

Core Team

Below are some of the key people that worked on this project.

  • Portrait of Lizzie Le Mare
    Lizzie Le Mare
    Director
Portrait of Lizzie Le Mare

Start the conversation...

Learn more about King's Crescent, Hackney and other projects by contacting one of our team

Call Lizzie on 0207 089 2121 or email Lizzie.LeMare@tibbalds.co.uk